EFIWE GISTS: Photos Of 4th Mainland Bridge And Its Master Plan

3644559_oma4mainlandbridge2960x550
There are great opportunities in the heart of Lagos…
With these opportunities come an intense congestion; causing pressures that threaten to paralyze the city’s circulation, its growth and its people.
3644560_oma4mainlandbridge6960x550
To reduce this pressure, we propose an operation – the 4th Mainland Bridge.
The operation will be the insertion of a bypass; a bridge within the body of Lagos. In addition to this bridge, we also propose a new heart to support the bridge.
3644561_11fs
This ‘new bridge and new heart’ in the body of Lagos will not be typical infrastructure; they will connect people in large numbers and improve their natural flow through a reorganization of vehicular, waterways, and pedestrian modes of transportation.
The 2 level bridge will not only function as a means for vehicular traffic on its upper level, it will stimulate and accommodate pedestrian, social, commercial and cultural interactions on it’s lower level – ‘Lagos Life’ – with its tropical environment and intimate street level exchanges.
3644562_oma4thmainlandbridge12960x550
The Fourth Mainland Bridge in conjunction with existing road networks would establish a primary ring road around Lagos.
This ring road will provide alternative traffic routes from Lekki to Ikorodu, Ikeja to Ajah, relieving the 3rd Mainland bridge of its overstretched capacity.
3644567_oma4mainlandbridge4960x550
With this improved flow of people across Lagos, the city will be relieved of traffic congestion, will maximize its great opportunities and grow better.
3644577_oma4thmainlandbridgenodesupdate960x550


CLIENT: Missing Link Motorway Co.
PROGRAM: Infrastructure & Masterplan
AREA: 3km bridge, 120ha masterplan
STATUS: Approved Concept Design 2008
KUNLÉ ADEYEMI’S ROLE: Project Architect/Associate-in-charge

Post a Comment

Previous Post Next Post